General Production Worker


SAINT AUGUSTINE, FL 32086

Posted: 1/7/2025

Job Description

LaborMax Staffing is looking for a General Production Worker for a local warehouse.

Responsibilities Include But Not Limited To:

*Cut metal to specific dimensions, using horizontal band saws.

*Move materials by hand as needed.

*Recognize, set up, and operate hand and power tools used on the job.

*Layout, position, and secure parts and assemblies prior to assembly.

*Examine work pieces for defects and measure them with templates to ensure conformance with specifications.

*Recognize, setup and operate hand and power tools common to the metal fabrication trade.

*Perform basic maintenance and cleaning to keep equipment in good working order.

*Use safety equipment and practice safe work habits.

*Will perform other related duties as assigned or requested

Requirements:

Need to be capable of lifting 50-60 pounds with or without assistance. This position does require standing/walking majority of 8-hr shift. Will be required to wear full PPE. "LaborMax Staffing is an Equal Opportunity Employer"


To apply for this position, click the link below or contact the local office at (904) 494-8055

APPLY NOW

What's Happening


World Cup 2026 Staffing: What Employers Need to Know

When 6.5 million fans pour into North America for the FIFA World Cup, who staffs everything around them? The answer is reshaping the labor market in a dozen U.S. cities right now — and it reaches far beyond the stadium. If your business operates in a host market, World Cup 2026 staffing pressure is already competing for the same workers you rely on. Here's what's happening, why it touches every industry, and how to keep your crews full through the busiest summer in years.

Read more >>

Summer 2026 Event Staffing: Coverage When It Counts in Six Host Cities

Match Week 2026 is heading to Kansas City, Miami, Dallas, Houston, San Francisco, and Seattle — and if you run a hotel, a venue, a facility, or an event-services company in one of those cities, the headline isn't the matches. It's the squeeze. When hundreds of thousands of visitors land in a single market over a few weeks, every operation that touches them feels it at once. Front desks get slammed. Banquet floors run short. Parking lots, loading docks, and event corridors need bodies that didn't exist on the schedule last year. And the labor pool you normally pull from? It's getting recruited away by everyone else trying to staff the same surge. This is the part most operators underestimate. The crowds are predictable. The labor gap that comes with them is what catches teams flat-footed.

Read more >>

The 2026 Labor Shortage Is Stalling Projects — Here's How to Staff Through It

Your next project isn't behind because of weather. It's behind because you can't staff it. That's the reality facing operations leaders across construction, warehousing, and logistics in 2026. The work is there. The demand is there. What's missing are the skilled, reliable people needed to do it — and the gap is widening every quarter. Here's what the numbers say, and what they mean for your business.

Read more >>